Apply Schedule to Water Use Equipment

How can I apply a use schedule to the water use equipment? I can apply the peak load, but the only thing it seems I can apply a schedule to is the water temperature.

@Elliot_Glassman
I have added the params input for WaterUseEqp with this update Ironbug_update.v0.0.11.2.zip (255.2 KB)
:

Please let me know it this works.
Mingbo

1 Like