How to control 3 chillder operation scheme for load ratio using ironbug?

Hi @minggangyin

You can set this “LoadDistributionScheme” of your plantloop to “SequentialLoad” and hard-size all your chillers.
Plant load scheme.gh (52.9 KB)

This is what I get of each chiller’s electricity use rate to prove that three chillers are running sequentially.