OA schedule issue

One of our energy modelers reviewed the idf files generated by Honeybee/OS and noticed a few issues. I’ve copied her comments into several posts, 1 per item.

#5 OA schedule
The design requires outside air to be turned off during unoccupied time. The outside air is controlled using an outdoor air damper schedule which turns off outside air during unoccupied time. Is there a way to include minimum outside air schedule part of the controller: Outdoor air object? There is no schedule applied by default.
image

The images below show the option that is available in the HVAC template in energy plus.
image
image

in.idf (613.1 KB)
SchoolsFirstOffice.osm (724.7 KB)