I am using honeybee glazing based on ratio (ver 0.066), there is a problem in energyplus simulation, I have no idea how to fix it.
Solved, building should be at (0,0,0)
I am using honeybee glazing based on ratio (ver 0.066), there is a problem in energyplus simulation, I have no idea how to fix it.
Solved, building should be at (0,0,0)