Program Version,EnergyPlus, Version 9.5.0-de239b2e5f, YMD=2021.06.15 17:44, ** Warning ** ManageSizing: For a zone sizing run, there must be at least 1 Sizing:Zone input object. SimulationControl Zone Sizing option ignored. ************* Beginning Plant Sizing Calculations ** Warning ** Weather file location will be used rather than entered (IDF) Location object. ** ~~~ ** ..Location object=SITE 1 ** ~~~ ** ..Weather File Location=Melbourne RO VIC AUS NatHERS-TMY2-C BoM 86071 CZ0609 WMO#=948680 ** ~~~ ** ..due to location differences, Latitude difference=[37.81] degrees, Longitude difference=[144.97] degrees. ** ~~~ ** ..Time Zone difference=[10.0] hour(s), Elevation difference=[3200.00] percent, [32.00] meters. ** Warning ** ProcessScheduleInput: Schedule:Day:Interval="APARTMENTHIGHRISE APT_DHW_SCH_SMRDSN", Blank Schedule Type Limits Name input -- will not be validated. ** Warning ** ProcessScheduleInput: Schedule:Day:Interval="APARTMENTHIGHRISE APT_DHW_SCH_WNTRDSN", Blank Schedule Type Limits Name input -- will not be validated. ** Warning ** ProcessScheduleInput: Schedule:Day:Interval="APARTMENTHIGHRISE INF_APT_SCH_SMRDSN", Blank Schedule Type Limits Name input -- will not be validated. ** Warning ** ProcessScheduleInput: Schedule:Day:Interval="APARTMENTHIGHRISE INF_APT_SCH_WNTRDSN", Blank Schedule Type Limits Name input -- will not be validated. ** Warning ** ProcessScheduleInput: Schedule:Day:Interval="APARTMENTHIGHRISE LTG_APT_SCH_SMRDSN", Blank Schedule Type Limits Name input -- will not be validated. ** Warning ** ProcessScheduleInput: Schedule:Day:Interval="APARTMENTHIGHRISE LTG_APT_SCH_WNTRDSN", Blank Schedule Type Limits Name input -- will not be validated. ** Warning ** ProcessScheduleInput: Schedule:Day:Interval="SCHEDULE DAY 2", Blank Schedule Type Limits Name input -- will not be validated. ** Warning ** ProcessScheduleInput: Schedule:Day:Interval="SCHEDULE DAY 3", Blank Schedule Type Limits Name input -- will not be validated. ** Warning ** ProcessScheduleInput: Schedule:Year="0.05 HOT WATER LATENT FRACTION", Blank Schedule Type Limits Name input -- will not be validated. ** Warning ** ProcessScheduleInput: Schedule:Year="0.2 HOT WATER SENSIBLE FRACTION", Blank Schedule Type Limits Name input -- will not be validated. ** Warning ** ProcessScheduleInput: Schedule:Constant="ALWAYS OFF DISCRETE", Blank Schedule Type Limits Name input -- will not be validated. ** Warning ** ProcessScheduleInput: Schedule:Constant="ALWAYS ON CONTINUOUS", Blank Schedule Type Limits Name input -- will not be validated. ** Warning ** GetHTSurfaceData: Surfaces with interface to Ground found but no "Ground Temperatures" were input. ** ~~~ ** Found first in surface=SURFACE-7_REVERSED ** ~~~ ** Defaults, constant throughout the year of (18.0) will be used. ** Warning ** CheckUsedConstructions: There are 17 nominally unused constructions in input. ** ~~~ ** For explicit details on each unused construction, use Output:Diagnostics,DisplayExtraWarnings; ************* Testing Individual Branch Integrity ************* All Branches passed integrity testing ************* Testing Individual Supply Air Path Integrity ************* All Supply Air Paths passed integrity testing ************* Testing Individual Return Air Path Integrity ************* All Return Air Paths passed integrity testing ************* No node connection errors were found. ************* Beginning Simulation ** Warning ** The resource referenced by LifeCycleCost:UsePriceEscalation= "U.S. AVG COMMERCIAL-ELECTRICITY" has no energy cost. ** ~~~ ** ... It is likely that the wrong resource is used. The resource should match the meter used in Utility:Tariff. ** Warning ** The resource referenced by LifeCycleCost:UsePriceEscalation= "U.S. AVG COMMERCIAL-DISTILLATE OIL" has no energy cost. ** ~~~ ** ... It is likely that the wrong resource is used. The resource should match the meter used in Utility:Tariff. ** Warning ** The resource referenced by LifeCycleCost:UsePriceEscalation= "U.S. AVG COMMERCIAL-RESIDUAL OIL" has no energy cost. ** ~~~ ** ... It is likely that the wrong resource is used. The resource should match the meter used in Utility:Tariff. ** Warning ** The resource referenced by LifeCycleCost:UsePriceEscalation= "U.S. AVG COMMERCIAL-NATURAL GAS" has no energy cost. ** ~~~ ** ... It is likely that the wrong resource is used. The resource should match the meter used in Utility:Tariff. ** Warning ** The resource referenced by LifeCycleCost:UsePriceEscalation= "U.S. AVG COMMERCIAL-COAL" has no energy cost. ** ~~~ ** ... It is likely that the wrong resource is used. The resource should match the meter used in Utility:Tariff. ************* Simulation Error Summary ************* ** Warning ** The following Report Variables were requested but not generated -- check.rdd file ** ~~~ ** Either the IDF did not contain these elements, the variable name is misspelled, ** ~~~ ** or the requested variable is an advanced output which requires Output : Diagnostics, DisplayAdvancedReportVariables; ************* Key=*, VarName=AFN ZONE INFILTRATION SENSIBLE HEAT GAIN ENERGY, Frequency=Hourly ************* Key=*, VarName=ZONE GAS EQUIPMENT NATURALGAS ENERGY, Frequency=Hourly ************* Key=*, VarName=ZONE IDEAL LOADS SUPPLY AIR TOTAL COOLING ENERGY, Frequency=Hourly ************* Key=*, VarName=ZONE IDEAL LOADS SUPPLY AIR TOTAL HEATING ENERGY, Frequency=Hourly ************* Key=*, VarName=ZONE IDEAL LOADS ZONE TOTAL COOLING ENERGY, Frequency=Hourly ************* Key=*, VarName=ZONE IDEAL LOADS ZONE TOTAL HEATING ENERGY, Frequency=Hourly ************* Key=*, VarName=AFN ZONE INFILTRATION SENSIBLE HEAT LOSS ENERGY, Frequency=Hourly ************* Key=*, VarName=ZONE VENTILATION FAN ELECTRICITY ENERGY, Frequency=Hourly ************* Key=*, VarName=ZONE VENTILATION TOTAL HEAT GAIN ENERGY, Frequency=Hourly ************* Key=*, VarName=ZONE VENTILATION TOTAL HEAT LOSS ENERGY, Frequency=Hourly ************* Key=*, VarName=AFN ZONE VENTILATION SENSIBLE HEAT GAIN ENERGY, Frequency=Hourly ************* Key=*, VarName=AFN ZONE VENTILATION SENSIBLE HEAT LOSS ENERGY, Frequency=Hourly ************* There are 25 unused schedules in input. ************* There are 25 unused week schedules in input. ************* There are 45 unused day schedules in input. ************* Use Output:Diagnostics,DisplayUnusedSchedules; to see them. ************* ************* ===== Recurring Error Summary ===== ************* The following recurring error messages occurred. ************* ************* ** Warning ** Plant loop falling below lower temperature limit, PlantLoop="SERVICE HOT WATER LOOP" ************* ** ~~~ ** This error occurred 208 total times; ************* ** ~~~ ** during Warmup 24 times; ************* ** ~~~ ** during Sizing 0 times. ************* ** ~~~ ** Min=3.333333 ************* ************* ************* ===== Final Error Summary ===== ************* The following error categories occurred. Consider correcting or noting. ************* Nominally Unused Constructions ************* ..The nominally unused constructions warning is provided to alert you to potential conditions that can cause ************* ..extra time during simulation. Each construction is calculated by the algorithm indicated in the HeatBalanceAlgorithm ************* ..object. You may remove the constructions indicated (when you use the DisplayExtraWarnings option). ************* ************* EnergyPlus Warmup Error Summary. During Warmup: 0 Warning; 0 Severe Errors. ************* EnergyPlus Sizing Error Summary. During Sizing: 1 Warning; 0 Severe Errors. ************* EnergyPlus Completed Successfully-- 230 Warning; 0 Severe Errors; Elapsed Time=00hr 00min 4.77sec