Hi guys,
After that Chris solved my problem with the glazing system, I made a step forward. I started to set up the materials of the opaque parts, A, of the facade system.
The opaque system is made of two layers:
-
PCM material;
-
Metal panel.
I used a part of script that I found in the discussion forum to create a PCM material and add the additional strings required in the Energy Plus simulation.
Can anyone tell me if all it’s right?
Thanks to all you guys.
test room_energy analysis_GOOD_1.gh (671 KB)