Hello! ( I have attached the file. generation.gh (618.1 KB) )(upload://8OvCNRDnegOLtT3gR5B94JBSN2Y.gh) (618.1 KB)
I wanted to get power generation through “Honeybee_generator_PV”.
However, “Honeybee_read_generation_system_results” encountered an error when simulating with energy plus.
(I’m asking for your help because I don’t know how to solve it.)
(1. Failed to parse the result file. Check the folder of the file address you are plugging into this component and make sure that there is a .csv file in the folder.
If there is no csv file or there is a file with no data in it (it is 0 kB), your simulation probably did not run correctly.
In this case, check the report out of the Run Simulation component to see what severe or fatal errors happened in the simulation.
If the csv file is there and it seems like there is data in it (it is not 0 kB), you are probably requesting an output that this component does not yet handle well.
If you report this bug of reading the output on the GH forums, we should be able to fix this component to accept the output soon.)

Additionally, I am using the most recent version of the legacy version.

Separately, I don’t know if the following statements are an additional problem in Energy Plus:
(Current document units is in Meters
Conversion to Meters will be applied = 1.000
Current document units is in Meters
Conversion to Meters will be applied = 1.000
Duplicate surface name! Name is changed to: Interior_Wall_Dup
Duplicate surface name! Name is changed to: Exterior_Wall_Dup
[1 of 8] Writing simulation parameters…
[2 of 8] No context surfaces…
[3 of 8] Writing geometry…
[4 of 8] Writing Electric Load Center - Generator specifications …
[5 of 8] Writing materials and constructions…
[6 of 8] Writing schedules…
[7 of 8] Writing loads and ideal air system…
[8 of 8] No outputs! You usually want to get some outputs when you run an analysis. Just saying…
We’ll just request some energy-related outputs for you that are monthly.

… idf file is successfully written to : c:\ladybug\unnamed\EnergyPlus\unnamed.idf

Analysis is running!..

Done! Read below for errors and warnings:

Program Version,EnergyPlus, Version 9.4.0-998c4b761e, YMD=2021.03.16 19:17,

** Warning ** Version: in IDF="=9.3.0" not the same as expected=“9.4”

** Warning ** Version: in IDF="=9.3.0" not the same as expected=“9.4”

************* Beginning Zone Sizing Calculations

** Warning ** GetHTSurfaceData: Surfaces with interface to Ground found but no “Ground Temperatures” were input.

** ~~~ ** Found first in surface=FLOOR

** ~~~ ** Defaults, constant throughout the year of (18.0) will be used.

** Warning ** GeneratorController constructor ElectricLoadCenter:Generators, Availability Schedule for Generator:Photovoltaics ‘MODULE 1’ of Type PhotovoltaicPerformance:Simple will be be ignored (runs all the time).

** ~~~ ** To limit this Generator:Photovoltaic’s output, please use the Inverter’s availability schedule instead.

** Warning ** GeneratorController constructor ElectricLoadCenter:Generators, Availability Schedule for Generator:Photovoltaics ‘MODULE 2’ of Type PhotovoltaicPerformance:Simple will be be ignored (runs all the time).

** ~~~ ** To limit this Generator:Photovoltaic’s output, please use the Inverter’s availability schedule instead.

** Warning ** GeneratorController constructor ElectricLoadCenter:Generators, Availability Schedule for Generator:Photovoltaics ‘MODULE 3’ of Type PhotovoltaicPerformance:Simple will be be ignored (runs all the time).

** ~~~ ** To limit this Generator:Photovoltaic’s output, please use the Inverter’s availability schedule instead.

** Warning ** GeneratorController constructor ElectricLoadCenter:Generators, Availability Schedule for Generator:Photovoltaics ‘MODULE 4’ of Type PhotovoltaicPerformance:Simple will be be ignored (runs all the time).

** ~~~ ** To limit this Generator:Photovoltaic’s output, please use the Inverter’s availability schedule instead.

** Warning ** GeneratorController constructor ElectricLoadCenter:Generators, Availability Schedule for Generator:Photovoltaics ‘MODULE 5’ of Type PhotovoltaicPerformance:Simple will be be ignored (runs all the time).

** ~~~ ** To limit this Generator:Photovoltaic’s output, please use the Inverter’s availability schedule instead.

** Warning ** ManageSizing: For a plant sizing run, there must be at least 1 Sizing:Plant object input. SimulationControl Plant Sizing option ignored.

************* Testing Individual Branch Integrity

************* All Branches passed integrity testing

************* Testing Individual Supply Air Path Integrity

************* All Supply Air Paths passed integrity testing

************* Testing Individual Return Air Path Integrity

************* All Return Air Paths passed integrity testing

************* No node connection errors were found.

************* Beginning Simulation

************* Simulation Error Summary *************

** Warning ** The following Report Variables were requested but not generated – check.rdd file

** ~~~ ** Either the IDF did not contain these elements, the variable name is misspelled,

** ~~~ ** or the requested variable is an advanced output which requires Output : Diagnostics, DisplayAdvancedReportVariables;

************* Key=*, VarName=ZONE LIGHTS ELECTRIC ENERGY, Frequency=Monthly

************* Key=*, VarName=ZONE ELECTRIC EQUIPMENT ELECTRIC ENERGY, Frequency=Monthly

************* Key=*, VarName=FACILITY NET PURCHASED ELECTRIC ENERGY, Frequency=Hourly

************* Key=*, VarName=FACILITY TOTAL ELECTRIC DEMAND POWER, Frequency=Hourly

************* Key=PV Blind System:DISTRIBUTIONSYSTEM, VarName=ELECTRIC LOAD CENTER PRODUCED ELECTRIC ENERGY, Frequency=Hourly

************* EnergyPlus Warmup Error Summary. During Warmup: 0 Warning; 0 Severe Errors.

************* EnergyPlus Sizing Error Summary. During Sizing: 7 Warning; 0 Severe Errors.

************* EnergyPlus Completed Successfully-- 10 Warning; 0 Severe Errors; Elapsed Time=00hr 00min 2.47sec

)