I was trying to use the HB_annual schedule component which needs the lists of schedule for cool design day and heat design day, if I do not connect a list with them and the default will assign Monday schedule and Sunday schedule with them. But I check the E+ for that, which actually is on/off schedule (1 or 0) rather than fractional schedule.
I also check the OCC schedule from E+, within the OCC schedule list only specifies the Summer Design Day (fractional values), weekdays (fractional values), Saturdays (fractional), and All the other days (which is 0 for 24 hours) , does it mean the Winter Design Day was included in All the other days?
How to solve that?
