IdealLoads Availability Schedule

Hi all,

I am trying to set the availability schedule for the ideal loads systems using the AirDetails component (using RunEnergySimulation **not **OS). However it appears to creating duplicate schedules for each zone.


Ao,

The Run Energy simulation component is currently deprecated and you should be using the OpenStudio component. I have not been able to create your issue on the OpenStudio component. I only get one availability schedule when I use the following:

-Chris

idealAirSched.gh (533 KB)

I realize that, if we’re still keeping the EnergyPlus component in the tab, we should fix the bugs in it. I still recommend using the OpenStudio component but you can see that I fixed the bug here:

https://github.com/mostaphaRoudsari/honeybee/commit/5d1689daaadf6b3…

And the attached file works:

Thanks for bringing this to our attention.

-Chris

idealAirSched2.gh (515 KB)