Ironbug Schedule/ Ladybug-Comfort Mannequin

I used Ironbug to build detailed VAV and radiant floor systems, incorporating both heating and cooling modes, and compared the two systems based on EUI, heating and cooling loads, and thermal comfort. I created all schedules in the HB Program Type, connected them to the HB Room, and then added the HVAC system. I did not add the setpoint schedule directly in Ironbug. Does this configuration work correctly, or must I add the schedule directly in Ironbug? If so, what is the best approach?

Additionally, I want to use a Ladybug-Comfort Mannequin in the radiant system to assess colored mannequins based on their relationship to a comfort temperature. The only input I might use is ambient temperature or target temperature, but I’m unsure how to connect it to the HVAC system. Thank you for your assistance.

The best way to find out the answer is to read the simulation output data to verify if your schedule is setting correctly.